Volume 3 - Supporting Reports
Volume 3 – Supporting Reports
Chapter 1
Appendix 1.1 – Glossary and Abbreviations
Chapter 4
Appendix 4.1 – EIA Scoping Report
Appendix 4.2 – Scoping Opinion from PINS
Appendix 4.3 – Scoping Opinion Response Matrix
Chapter 5
Appendix 5.1 Air Quality Method Statement
Appendix 5.2 Response on Air Quality Method Statement
Chapter 6
Appendix 6.1 Preliminary Ecological Appraisal Report 1
Appendix 6.2 Preliminary Ecological Appraisal Report 2 (Brauncewell)
Appendix 6.3 Preliminary Ecological Appraisal – Grid Connection Corridor
Appendix 6.4 Breeding Bird Survey Report
Appendix 6.5 Bat Activity Survey Report
Chapter 7
Appendix 7.1 GHG Emission factors
Chapter 8
Appendix 8.1 Archaeological Desk Based Assessment
Appendix 8.2 Aerial Investigation Report
Appendix 8.3 Geophysical Report
Appendix 8.4 Listed Building visibility
Appendix 8.5 Listed dwellings in settlements over 1km from the Site
Chapter 9
Appendix 9.1 LVIA Methodology and Assessment Criteria
Appendix 9.2 Extracts from Published Landscape Character Assessments
Appendix 9.3 Landscape Sensitivity Appraisal
Appendix 9.4 Preliminary Viewpoint Analysis
Appendix 9.5 Preliminary Residential Visual Amenity Assessment
Chapter 10
Appendix 10.1 – Preliminary Risk Appraisal
Chapter 15